PROGRESS THUS FAR ON THE CHURCH BUILDING PROJECT
05 September 2015, Water Baptism
Baptism Pool as on 18 October 2015
Baptism Pool as on 18 May 2015
02 August 2014, Roofing Progress
27 July 2014, Saturday
Roof for Office is underway
27 July 2014, Sunday (Day 03 of Western Lineco Conference)
08 December 2013, Sunday Service
01 December 2013, Sunday
29 November 2013, Friday, Floor Paving
08 November 2013, Friday, Soil being poured onto the floor
As on Sunday, the 6th October 2013
As on Sunday, the 8th September 2013
The smaller stage inside the church
As on Sunday, the 25th August 2013
As on Sunday, the 22nd August 2013
The inside of the church building is currently being plastered. A lot of cement is needed now for the flooring and the plastering of the walls.